2019 Road Projects

By |2019-05-08T08:18:22-05:00May 8th, 2019|News|

Please see below for the full list of 2019 Road Projects. As additional road projects are finalized, they will be added to this page. Additional projects include those requiring agreements with local municipalities or those for which ancillary funding is secured.

How do we pay for road projects?

Federal: Some road projects are possible because of federal dollars. These are obtained in a thorough, sometimes multi-year application process.

Primary: The paving schedule for primary roads is determined based on an in-depth planning process that CCRD updates on a regular basis.

Local: 2019 local road projects are being finalized with the townships. When confirmed, those projects will be added to this web page.

Interactive Map

Albion Township

  • 25 1/2 Mile Road
    Between F Drive S and Finley Dr.
    Crush and shape and 3.5” solid paving; New 3-ft paved shoulders
    3 miles of construction
    Federally funded project
  • B Drive S
    Between 29 1/2 and 30 Mile Road
    2.0” solid paving
    Primary road paving project

Athens Township

  • 1 Mile Rd
    Between R Drive S and T Drive S
    Crush and shape and 3.5” solid paving
    Replacing and upsizing culvert, upgrading signs and pavement markings
    Tribal-funded project

Athens/Burlington Townships

  • 6 Mile Rd
    Between N Drive S and U Drive S
    1.5” skip pave
    Primary road paving project

Bedford Township

  • Waubascon Rd
    Between Morgan Rd and Jones Rd
    1.5” skip pave
    Primary road paving project
  • Uldriks Rd (1 Mile Rd)
    Between Meachem Rd. and County Line
    1.5” skip pave
    Primary road paving project

Bedford/Pennfield Townships

  • North Ave
    Between Halbert Rd and Baseline
    Widening paved surface to provide 3 feet shoulders
    Overlay existing pavement with combination 1.5” and 3” paving
    2.6 miles of construction
    Federally funded project

Burlington Township

  • Union City Rd
    Between 7 1/2 Mile Rd and P Drive S
    Adding a 3’ paved shoulder
    Resurfacing bridge and installing a new waterproof membrane
    Crush and shape and 3.5” solid paving
    1.03 miles of construction
    Federally funded project
  • S County Line
    Between 11 Mile and 12 Mile
    2.0” solid paving
    Primary road paving project

Clarence Township

  • 26 1/2 Mile Rd
    Between V Drive N and U Drive N
    2.0” solid paving
    Primary road paving project

Clarendon Township

  • 18 1/2 Mile Rd
    Between Bridge and T Drive S
    2.0” solid paving
    Primary road paving project
  • 22 Mile Rd
    Between M-60 and L Drive S
    1.5” skip paving
    Primary road paving project

Eckford Township

  • 22 Mile Rd
    Between Division Dr and F Drive S
    1.5” skip paving
    Primary road paving project
  • 18 1/2 Mile Rd
    Between Homer Rd and B Drive S
    2.0” solid paving
    Primary road paving project

Emmett/Fredonia/Marshall/Newton Townships

  • 12 Mile Rd
    Between A Drive N and B Drive S
    1.5” skip paving
    Primary road paving project

Homer Township

  • 25 1/2 Mile Rd
    Between village limits and L Drive S
    2.0” solid paving
    Primary road paving project

Lee Township

  • V Drive N
    Between 21 Mile Rd and 20 Mile Rd
    1.5” skip paving
    Primary road paving project
  • N Drive N
    Between 18 Mile Rd and 21 1/2 Mile Rd
    1.5” skip paving
    Primary road paving project
  • 23 Mile Rd
    Between V Drive N and T Drive N
    2.0” solid paving
    At intersection, 3.0” solid paving at intersection
    Primary road paving project
  • R Drive N
    Between 21 Mile Rd and 21 1/2 Mile Rd
    1.5” skip paving
    Primary road paving project

Leroy Township

  • B Drive S
    Between 6 Mile Rd and M-66
    Mill and fill with 2” overlay
    Primary road paving project
  • Carver Rd
    Between A Drive S and City Limits
    1.5” skip paving
    Primary road paving project
  • B Drive S
    Between B Drive S and 3 Mile Rd
    2.0” solid paving
    Primary road paving project

Marengo Township

  • Division Dr.
    Between Homer Rd and 22 Mile Rd
    1.5” skip paving
    Primary road paving project
  • G Drive N
    Between 19 Mile Rd and 20 Mile Rd
    1.5” skip paving
    Primary road paving project

Marengo/Sheridan Townships

  • Michigan Avenue
    Between 22 1/2 Mile Rd and 25 1/2 Mile Rd
    2” mill and fill
    3 miles of construction
    Federally funded project

Marshall Township

  • F Drive N/West Drive
    Between Verona Rd and Old 27
    Crush and shape and 3.5” solid paving
    1.98 miles of construction
    Federally funded project
  • 16 1/2 Mile Rd/G Drive N
    Between J Drive N and Old 27
    1.5” skip paving
    Primary road paving project

Pennfield Township

  • Pine Lake Rd
    Between Bellevue Rd and Chippewa Trail
    2.0” solid paving
    Primary road paving project

Sheridan Township

  • H Drive N
    Between 26 Mile Rd and 28 Mile Rd
    1.5” skip paving
    Primary road paving project
  • J Drive N
    Between 29 Mile Rd and 30 Mile Rd
    1.5” skip paving
    Primary road paving project

Tekonsha Township

  • Jackson Rd E
    Between village limits and M-60
    1.5” skip paving
    Primary road paving project

Safety Grants

Safety grants allow the CCRD to update the warning signals that keep drivers safe. Safety grants are funding three projects in 2019.

Stop signs with LED Flashing Lights

  • 6 1/2 Mile Rd and Golden Ave in Emmett Township
  • East Ave and Roosevelt in Pennfield Township

Traffic Signal Modernization

  • Raymond Rd and Cliff St in Emmett Township

Tree Removal

Trees will be removed in the following locations in 2019 during appropriate tree-cutting seasons.

  • Condit Rd in Albion Township
  • 13 Mile Rd in Convis Township
  • 13 Mile Rd in Fredonia Township
  • Oak Grove Rd in Newton Township
  • East Ave in Pennfield Township
  • 29 Mile Rd in Sheridan Township

1 1/2 Mile and O Drive Intersection Reconstruction

By |2018-09-18T14:47:04-05:00September 18th, 2018|Construction Notices, News|

O Drive S Detour

O Drive S Detour

The intersection of 1 1/2 Mile Road and O Drive South is being reconstructed in Athens Township, Mich. This work will include crushing and shaping the existing roadway, reconstructing the intersection alignment into a “T”, and paving the new surface with hot mix asphalt. This project is funded by the Calhoun County Road Department.

During construction, the road will be closed to all traffic. A detour is posted. It is anticipated that this work will be completed no later than Sunday, Sept. 30, 2018, weather permitting. Click on the photo to see the detour.